Opening Hours
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Kern River No. 3 - Intake flume. Note alligatored and peeled paint below water line.
photCL SCE 02 - 27217

Visual Materials
Kern River No. 3 - Intake flume. Showing deteriorated coal tar paint.
photCL SCE 02 - 27216

Visual Materials
Kern River No. 1, Borel Powerhouse, Kern River No. 3 - KR 1, KR 2, & KR 3, Kings River Power Co., Kings River - Kern River PH #1 & cottages, headworks, Lucac Creek Flume, Cow Creek flume, forebay weir to spillway; Borel Powerhouse with 5 penstocks, Isabella (1907); Kings River #1 Water Appropriation Notice, Kings River #2 - Camp near Mill Creek, posted notice, material storage, warehouse at Tunnel 9; Kings River #3 - South Fork Gorge & Intake site, Crown Valley, Little Brush Creek, construction road, Water Appropriation Notice; Kings River #4 - Tehacipi Basin, lumber yards, water appropriation notice at intake site, P.D. Plant and spillway at mouth of Kern Canyon.
photCL SCE 13 - vol 102
Image not available
Visual Materials
Kings River Powerhouse No. 1 and cottages, headworks, Lucas Creek Flume, Cow Creek flume, Borel Powerhouse with 5 penstocks, Isabella (1907); Kings River No. 1 Water Appropriation Notice, Kings River No. 2 - Camp near Mill Creek, posted notice, material storage, warehouse at Tunnel 9; Kings River No. 3 - South Fork Gorge and Intake site, Crown Valley, Little Brush Creek, construction road, Water Appropriation Notice; Kings River No. 4 - Tehachapi Basin, lumber yards, water appropriation notice at intake site, P.D. Plant and spillway at mouth of Kern Canyon.
photCL SCE

Visual Materials
Kern River No. 3 - Fairview Dam and intake facilities for Kern 3
photCL SCE 02 - 06239
Image not available
Visual Materials
Kern River No. 1, including site for Democrat Dam; Dam construction and drainage tower; intake; dam spilling; Construction at Camp 4; Kern River Canyon, hospital, tunnel workers, tunnel portal, concrete mixing plant, concrete flume, tunnel automobiles; Camp 1, penstock construction, branch pipes, Powerhouse construction, machinery transport to site, assembly of units in powerhouse, placing "Y" piece, main water valve needle, exciter needle, impulse wheel and buckets, transformers, tailrace construction, original spillway, towers and erect insulators, transmission line; Tejon, Castaic and Fernando Substations, Los Angeles No. 3 Steam Plant.
photCL SCE