Visual Materials
M-68 Electric train and men from Camp 63 working in Florence Lake Tunnel
You might also be interested in

M-67 Heading-Bench with men from Camp 62 in Florence Lake Tunnel
Visual Materials
M-67 Heading-Bench with men from Camp 62 in Florence Lake Tunnel, on the Big Creek Project. Excavating typical hard-rock section.
photCL SCE 02 - 24051

Big Creek, Florence Lake Dam - Train emerging from Intake Portal of Florence Tunnel at Camp 63, and Roots
Visual Materials
Big Creek, Florence Lake Dam - Train emerging from Intake Portal of Florence Tunnel at Camp 63, and Roots-Connersville pressure blower being set up at right.
photCL SCE 02 - 09187

Big Creek, Florence Lake Dam - Men eating the Camp 63 Dining Room
Visual Materials
Big Creek, Florence Lake Dam - Men eating the Camp 63 Dining Room - Florence Tunnel crew.
photCL SCE 02 - 22933

Camp 63 was established at the site of the upper end of the Florence Lake Tunnel
Visual Materials
Camp 63 was established at the site of the upper end of the Florence Lake Tunnel, near the future site of Florence Dam. Although the dam was only built during the short summer seasons, work on the tunnel went on year around.
photCL SCE 12 - 00126

Big Creek, Florence Lake Dam - Tunnel men at Camp 60
Visual Materials
Big Creek, Florence Lake Dam - Tunnel men at Camp 60 - occassion of tunnel record 174 feet.
photCL SCE 02 - 12400

Workers in Florence Lake tunnel
Visual Materials
Workers in Florence Lake tunnel, Camp 63
photCL SCE 02 - 22793