Visual Materials
Visual Materials
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Boulder-Chino Transmission Line (2nd) - Pulling out conductors and ground wire with winch lines.
photCL SCE 02 - 23551

Visual Materials
Boulder-Chino Transmission Line (2nd) - Reeling in Pulling line with reel truck at M1-T1
photCL SCE 02 - 23240

Visual Materials
Boulder-Chino Transmission Line (2nd) - Reeling in Pulling line with reel truck at M1-T1
photCL SCE 02 - 23241

Visual Materials
Boulder-Chino Transmission Line (2nd) - Pulling out conductor under tension - M92-T3.
photCL SCE 02 - 23268

Visual Materials
Boulder-Chino Transmission Line (2nd) - Pulling out conductors at cross over between Old and New Boulder Lines.
photCL SCE 02 - 24417

Visual Materials
Boulder-Chino Transmission Line (2nd) - Hand excavation for Tower foundations, location M135-T1.
photCL SCE 02 - 23250