Visual Materials
Big Creek Powerhouse #3
- Description
- Big Creek Powerhouse #3 - Completed intake tower for Tunnel #3. Powerhouse 8 in background.
- Date
- 10/7/1940
- Call number
- photCL SCE 02 - 22924
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek Powerhouse #3 - Placing trashracks at Tunnel 3 Intake tower. Dam 6 nearly completed except for shutting off temporary sluiceways.
photCL SCE 02 - 08561

Visual Materials
Big Creek Powerhouse #3 - Start of excavation for Tunnel 3 intake tower at Dam #6 site.
photCL SCE 02 - 08320

Visual Materials
Big Creek Powerhouse #3 - Dam 6, Intake Tunnel 3, and Powerhouse #8. [Dam is incorrectly labeled as Dam 3 on the negative and also in logbook]
photCL SCE 02 - 12675

Visual Materials
Big Creek Powerhouse #3 - Tunnel #3 intake and Dam #6 taken from a point between PH #8 and the San Joaquin River.
photCL SCE 02 - 08553

Visual Materials
Big Creek Powerhouse #3 - Excavation for intake tower at Dam #6.
photCL SCE 02 - 08333

Visual Materials
Big Creek Powerhouse #3 - Dam 6 and Tunnel #3 Intake.
photCL SCE 02 - 12528