Visual Materials
Barre-Lighthipe Transmission Line
- Description
- Barre-Lighthipe Transmission Line - Measuring Cut-off. Installing Dead-End Insulator Strings at M6-T1
- Date
- 7/1/1941
- Call number
- photCL SCE 02 - 23528
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Barre-Lighthipe Transmission Line - Pulling casing for cover piles. M12-T1.
photCL SCE 02 - 23283

Visual Materials
Barre-Lighthipe Transmission Line - Looking north from Barre Substation.
photCL SCE 02 - 23290

Visual Materials
Barre-Lighthipe Transmission Line - tower construction at Barre Substation M15-T4.
photCL SCE 02 - 23282

Visual Materials
Barre-Lighthipe Transmission Line - Construction alongside M. C. Transmission Lines.
photCL SCE 02 - 23536

Visual Materials
Barre-Lighthipe Transmission Line - View of get-away from new rack at Barre Substation.
photCL SCE 02 - 23298

Visual Materials
Barre-Lighthipe Transmission Line - Mucking out holes. T90
photCL SCE 02 - 23292