Visual Materials
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Boulder-Chino Transmission Line (2nd) - Tower M0-T5 with wire stringing completed and bird guards etc. placed.
photCL SCE 02 - 23242

Visual Materials
Boulder-Chino Transmission Line (2nd) - Installing bird guards at M113-T1
photCL SCE 02 - 23270

Visual Materials
Boulder-Chino Transmission Line (2nd) - Erecting bird guards at M208-T3.
photCL SCE 02 - 23552

Visual Materials
Boulder-Chino Transmission Line - Engineer on tower checking sag in line.
photCL SCE 02 - 20281

Visual Materials
Boulder-Chino Transmission Line - Danger sign on tower.
photCL SCE 02 - 20725

Visual Materials
Boulder-Chino Transmission Line - Vibration test on tower.
photCL SCE 02 - 20729