Visual Materials
Boulder-Chino Transmission Line
You might also be interested in

Boulder-Chino Transmission Line
Visual Materials
Boulder-Chino Transmission Line - Byers excavating at Mi. 180-2
photCL SCE 02 - 20251

Boulder-Chino Transmission Line
Visual Materials
Boulder-Chino Transmission Line - Byers erecting panel on tower 176-3.
photCL SCE 02 - 20256

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Erecting Tower Steel with Byers crane at Location M55-T2.
photCL SCE 02 - 23248

Boulder-Chino Transmission Line
Visual Materials
Boulder-Chino Transmission Line - [transmission line route?]
photCL SCE 02 - 19892

Boulder-Chino Transmission Line
Visual Materials
Boulder-Chino Transmission Line - [Transmission line corriodor]
photCL SCE 02 - 20406

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Getaway for 2nd Boulder-Chino line from the Chino Rack on right. First Boulder-Chino line is on the left.
photCL SCE 02 - 24425