Visual Materials
Boulder-Chino Transmission Line
You might also be interested in

Boulder-Chino Transmission Line
Visual Materials
Boulder-Chino Transmission Line - [blasting at tower site]
photCL SCE 02 - 19895

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Drilling holes for concrete piles in Vineyard at location M218-T2.
photCL SCE 02 - 23261

Boulder-Chino Transmission Line
Visual Materials
Boulder-Chino Transmission Line - [steel rebar for concrete tower supports ready for excavated holes.]
photCL SCE 02 - 20393

Boulder-Chino Transmission Line
Visual Materials
Boulder-Chino Transmission Line - [poured concrete tower supports in holes.]
photCL SCE 02 - 20394

Boulder-Chino Transmission Line
Visual Materials
Boulder-Chino Transmission Line - [Mixing concrete at the tower site].
photCL SCE 02 - 20396

Boulder-Chino Transmission Line
Visual Materials
Boulder-Chino Transmission Line - [Support stub in ground at tower site].
photCL SCE 02 - 20405