Visual Materials
Big Creek Powerhouse #8
- Description
- Big Creek Powerhouse #8 - Looking down Big Creek Channel towards Powerhouse #8. The derrick at the left serves the incline spur trestle.
- Date
- 11/9/1928
- Call number
- photCL SCE 02 - 15920
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek Powerhouse #8 - Looking across Big Creek Channel towards Powerhouse. The lower section of the draft tube Unit #2 is being placed. Tailrace Cofferdam in lower right-hand corner. End of incline spur in upper right-hand corner.
photCL SCE 02 - 15919

Visual Materials
Big Creek Powerhouse #8 - showing new roadway under Unit #1 Penstock. Incline trestle in the background.
photCL SCE 02 - 15917

Visual Materials
Big Creek Powerhouse #8 - Showing new roadway under Unit #1 Penstock. Incline trestle in the foreground.
photCL SCE 02 - 15924

Visual Materials
Big Creek Powerhouse #8 - Looking at lower end of location for 2nd unit penstock at Powerhouse #8, with mixing plant beginning to show in left side of picture. Penstock excavation is underway. Incline spur will come in upper right hand corner of picture just above present penstock and below telephone booth.
photCL SCE 02 - 15903

Visual Materials
Big Creek PH #2 - New Derrick at end of incline spur Camp 7
photCL SCE 02 - 06473

Visual Materials
Big Creek Powerhouse #2 - Powerhouse #2 and Incline Trestle.
photCL SCE 02 - 13501