Visual Materials
Big Creek #1
- Description
- Big Creek #1 - Transmission line from Powerhouse #1 looking West.
- Date
- 12/19/1924
- Call number
- photCL SCE 02 - 12418
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek #1 - Flowline for 4th Unit, Powerhouse #1. Looking West from Bend #13.
photCL SCE 02 - 12373

Visual Materials
Transmission coming out rear of Powerhouse #1 on the Big Creek Transmission Line.
photCL SCE 02 - 07332

Visual Materials
Big Creek Powerhouse #1 - proposed Line #3 Penstock relocation between Stations 4+04.17 and 9+42.97 (9+50.49). View looking toward A.P. at Station 4+04.17 from a point approximately 80 feet up hill.
photCL SCE 02 - 26559D

Visual Materials
Big Creek Powerhouse #4 - Big Creek 3 & 4 - Transmission line drilling for access road - mile 1.
photCL SCE 02 - 30040
Image not available
Visual Materials
Substations; Big Creek Powerhouse 1 and Powerhouse 2 construction and penstock construction, Huntington Lodge and Huntington Lake, heavy snowfall, break in Powerhouse 1 penstock joint, Construction of Dam 1, 2, and 4; incline railroad, railroad locomotives, Construction of Big Creek transmission line; Magunden Substation; Kern transmission line poles, line and railroad wash out at Arroyo Seco; Long Beach Steam Plant; Los Angeles Aqueduct and Powerhouse; Pacific Light and Power vehicles; Intake Azusa Plant, Azusa Powerhouse interior; Highgrove forebay and Powerhouse; Stone Castle; Sierra Powerhouse interior, operator's cottages; Pedley Powerhouse; Mentone Powerhouse; Borel Powerhouse.
photCL SCE

Visual Materials
Big Creek Powerhouse #4 - Grading transmission line road near Mile 1.
photCL SCE 02 - 30048