Visual Materials
Big Creek Powerhouse #8
You might also be interested in

Big Creek Powerhouse #8
Visual Materials
Big Creek Powerhouse #8 - Reinforcing bands on Penstock #8.
photCL SCE 02 - 12283

Big Creek Powerhouse #8
Visual Materials
Big Creek Powerhouse #8 - Reinforcing bands on Penstock #8.
photCL SCE 02 - 12285

Big Creek Powerhouse #8
Visual Materials
Big Creek Powerhouse #8 - Penstock #8 before putting on reinforcing bands.
photCL SCE 02 - 12168

Big Creek Powerhouse #8
Visual Materials
Big Creek Powerhouse #8 - Penstock #8 before putting on reinforcing bands.
photCL SCE 02 - 12169

Big Creek - Powerhouse #8 (part 2)
Visual Materials
Big Creek - Powerhouse #8 (part 2) [Powerhouse #8 - Diversion, excavation for powerhouse, diversion tunnel construction, interior shots of PH #8 (transformers, control room, turbine-generator assembly, station power, Johnson Valve, turbine runner, crane assembly, scroll case assembly, draft tube); Penstock rupture - ripped Penstock, flattened pipe, damage to powerhouse and other facilities, reshaping pipe, adding reinforcing bands to high stress sections of penstock; Camp 33, operator dormitory, substation, incline construction.]
photCL SCE 13 - vol 035

Big Creek Powerhouse #8 - Reinforcing rings - Kellogg Pipe
Visual Materials
Big Creek Powerhouse #8 - Reinforcing rings - Kellogg Pipe - Penstock #8.
photCL SCE 02 - 12048