Opening Hours
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek, Shaver Lake Dam - Looking downstream at the upstream face of the dam, showing the main section completed. Almost the same view as A769, except there is some more of the dam shown at the south end; also the complete chuting line and counterweight chutes at the end on both the center tower and the south tower.
photCL SCE 02 - 14707

Visual Materials
Big Creek, Shaver Lake Dam - Stevenson Creek - Looking south over concrete sections already poured as of November 6th, and showing the three steel towers. The two end ones were used in the construction of the multiple arch dam at Florence Lake.
photCL SCE 02 - 14293

Visual Materials
Big Creek, Shaver Lake Dam - View of Shaver Dam, showing particularly Section 18, which was left low when work was stopped late in 1926 and to allow for spillway. This section is now being brought up along with the others but will be kept four feet lower for a while. The track running up along the face of the dam lengthwise of the picture is the one over which concrete will be supplied to one of the towers not shown in the picture and which tower will be out of reach of the chuting system. .
photCL SCE 02 - 14325

Visual Materials
Big Creek, Shaver Lake Dam - Shaver Dam - with full reservoir.
photCL SCE 02 - 30722

Visual Materials
Big Creek, Shaver Lake Dam - Shaver Dam - with full reservoir.
photCL SCE 02 - 30723

Visual Materials
Big Creek, Shaver Lake Dam - Shaver Dam - with full reservoir.
photCL SCE 02 - 30724