Visual Materials
Big Creek, Shaver Lake Dam
- Description
- Big Creek, Shaver Lake Dam - Looking downstream along main channel of Stevenson Creek after all lumber, debris, etc., have been removed.
- Date
- 9/16/1926
- Call number
- photCL SCE 02 - 14253
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek, Shaver Dam - Looking downstream through the main channel of Stevenson Creek, showing bottom as being cleared out for concrete.
photCL SCE 02 - 14231

Visual Materials
Big Creek, Shaver Lake Dam - Looking upstream through main channel of Stevenson Creek, showing foundation in its final state and as it will be when covered with concrete.
photCL SCE 02 - 14241

Visual Materials
Big Creek, Shaver Lake Dam - Looking north along the downstream face of the dam, showing the main section completed.
photCL SCE 02 - 14708

Visual Materials
Big Creek, Shaver Lake Dam - Looking across main channel of Stevenson Creek towards foundation on south side, showing general cleanup of bottom between Stevenson Creek channel and higher part of foundation. The piles of rock noticed in the picture are to be distributed into the concrete when this particuloar section is poured.
photCL SCE 02 - 14239

Visual Materials
Big Creek, Shaver Lake Dam - Looking upstream at the damsite across the fifty foot section just to the left of the main Stevenson Creek Channel. We started pouring concrete into the is section yesterday afternoon.
photCL SCE 02 - 14234

Visual Materials
Big Creek, Shaver Lake Dam - Stevenson Creek close-up just north of main channel.
photCL SCE 02 - 14247