Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

Big Creek Powerhouse #3



You might also be interested in

  • Big Creek Powerhouse #3

    Big Creek Powerhouse #3

    Visual Materials

    Big Creek Powerhouse #3 - Flume to carry sluicing water at outlet of Tunnel 3.

    photCL SCE 02 - 09192

  • F.P.C. Vol 3, Projects 67 & 120 - Construction Big Creek Powerhouse 3 and construction camps

    F.P.C. Vol 3, Projects 67 & 120 - Construction Big Creek Powerhouse 3 and construction camps

    Visual Materials

    F.P.C. Vol 3, Projects 67 & 120 - Construction Big Creek Powerhouse 3 and construction camps. [Tunnel 3 - intake construction, portal adit Camp 36, Camp 35 adit, outlet portal, Penstock 3 portal structure and manifold, surge chamber, drill sharpeners, connecting 18' penstock to manifold, butterfly valve house, flume to carry sluicing water at outlet, surge chamber, Powerhouse 3 construction, installation of 3 penstocks, turbine and generator installations at PH #3, 220 kV switchyard.]

    photCL SCE 13 - vol 009

  • Big Creek Powerhouse #3

    Big Creek Powerhouse #3

    Visual Materials

    Big Creek Powerhouse #3 - 700 cfs of water used in sluicing Tunnel 3 flowing from outlet to San Joaquin River.

    photCL SCE 02 - 09428

  • Big Creek Powerhouse #3

    Big Creek Powerhouse #3

    Visual Materials

    Big Creek Powerhouse #3 - 700 cfs of water used in sluicing Tunnel 3 flowing from outlet to San Joaquin River.

    photCL SCE 02 - 09429

  • Big Creek Powerhouse #3 - Tunnel #3 outlet

    Big Creek Powerhouse #3 - Tunnel #3 outlet

    Visual Materials

    Big Creek Powerhouse #3 - Tunnel #3 outlet - excavation for sluicing.

    photCL SCE 02 - 09109

  • Big Creek Powerhouse #3 - Tunnel #3 outlet

    Big Creek Powerhouse #3 - Tunnel #3 outlet

    Visual Materials

    Big Creek Powerhouse #3 - Tunnel #3 outlet - excavation for sluicing.

    photCL SCE 02 - 09110