Visual Materials
Big Creek Powerhouse #8 - Looking across Big Creek Channel towards Powerhouse. The lower section of the draft tube Unit #2 is being placed. Tailrace Cofferdam in lower right-hand corner. End of incline spur in upper right-hand corner.
photCL SCE 02 - 15919

Visual Materials
Big Creek Powerhouse #8 - Setting Steel tube connecting tunnel 8 to forebay.
photCL SCE 02 - 07144

Visual Materials
Big Creek Powerhouse #3 - Fourth unit draft tube & relief valve liners
photCL SCE 02 - 27421

Visual Materials
Big Creek - Powerhouse #8 (part 2) [Powerhouse #8 - Diversion, excavation for powerhouse, diversion tunnel construction, interior shots of PH #8 (transformers, control room, turbine-generator assembly, station power, Johnson Valve, turbine runner, crane assembly, scroll case assembly, draft tube); Penstock rupture - ripped Penstock, flattened pipe, damage to powerhouse and other facilities, reshaping pipe, adding reinforcing bands to high stress sections of penstock; Camp 33, operator dormitory, substation, incline construction.]
photCL SCE 13 - vol 035

Visual Materials
Big Creek Powerhouse #4 - Dam 7 showing fish water turbine draft tube and temporary sluice pipe.
photCL SCE 02 - 30787

Visual Materials
Big Creek Powerhouse #3 - Unit 4 - Draft tube construction
photCL SCE 02 - 28279