Visual Materials
T2 Testing
- Description
- T2 Testing - Test on transmission cables at Camp #3.
- Date
- 9/29/1925
- Call number
- photCL SCE 02 - 13228
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
T2 Testing - Test on transmission cables at Camp #3 - close-up on data recorder.
photCL SCE 02 - 13231

Visual Materials
T2 Testing - Test spans installed at Gould for measurement of elongation under varying conditions of the aluminum conductors prior to use on the Vincent T/L; showing dynamometers mounted in the attachments at the poles to attain desired stresses in the cables, and the counterweights suspended from small cables which were connected to piano wire used for measuring elongation of the conductors. The two tower lines are part of the old Big Creek Transmission system.
photCL SCE 02 - 13230

Visual Materials
T2 Testing - Test on Steel Tower proposed for Colorado River Transmission Line.
photCL SCE 02 - 18596

Visual Materials
T2 Testing - Test on Steel Tower proposed for Colorado River Transmission Line.
photCL SCE 02 - 18597

Visual Materials
T2 Testing - Test on wood poles proposed for Colorado River Transmission Line.
photCL SCE 02 - 18598