Big Creek - Powerhouse #3 (part 1) [first forms up on powerhouse, staging and concrete plant, Switching Station, powerhouse steel framework, generator floor, draft tube construction, incline, views from above, penstock construction, Tunnel 3, CO2 equipment on Unit 3, Penstock binding, dispatcher's building, manifold assembly, oil circuit breakers, transformers, Dam 6 spilling, completed Powerhouse 3.]
photCL SCE 13 - vol 032

Visual Materials
Big Creek Powerhouse #3 - Powerhouse #3 Switching Station site showing excavation work and concrete foundations for circuit breakers and bus structure. [Hospital and Dormitory in background.]
photCL SCE 02 - 08554

Visual Materials
Big Creek Powerhouse #3 - Concrete forms for Generator Floor - Powerhouse #3, Camp 38.
photCL SCE 02 - 08552

Visual Materials
Big Creek Powerhouse #3 - Showing superstructure and first forms for concrete in - upstream side Dam #6.
photCL SCE 02 - 08318

Visual Materials
Big Creek Powerhouse #3 - Showing superstructure and first forms for concrete in - upstream side Dam #6.
photCL SCE 02 - 08319
Image not available
Visual Materials
Photographs of Powerhouse No. 3, Part 1. Construction photographs of first forms up on powerhouse, staging and concrete plant, Switching Station, powerhouse steel framework, generator floor, draft tube construction, incline, views from above, penstock construction, Tunnel 3, CO2 equipment on Unit 3, Penstock binding, dispatcher's building, manifold assembly, oil circuit breakers, transformers, Dam 6 spilling, completed Powerhouse 3.
photCL SCE