Visual Materials
Big Creek Powerhouse #3
- Description
- Big Creek Powerhouse #3 - Construction of Powerhouse #3 substructure at Generator Floor, showing yard layout and concrete plant.
- Date
- 4/2/1923
- Call number
- photCL SCE 02 - 08569
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek Powerhouse #3 - Staging and concrete plant, PH 3, showing combination track layout. [View of Powerhouse, and part of penstock ditch during early form construction]
photCL SCE 02 - 08530

Visual Materials
Big Creek Powerhouse #3 - Powerhouse #3 - Generator floor starting construction of staging for superstructure showing bridge for incline entrance.
photCL SCE 02 - 08570

Visual Materials
Big Creek Powerhouse #3 - Powerhouse #3 - Generator floor starting construction of staging for superstructure showing bridge for incline entrance.
photCL SCE 02 - 08571

Visual Materials
Big Creek Powerhouse #3 - Concrete forms for Generator Floor - Powerhouse #3, Camp 38.
photCL SCE 02 - 08552
Image not available
Visual Materials
Photographs of Powerhouse No. 3, Part 1. Construction photographs of first forms up on powerhouse, staging and concrete plant, Switching Station, powerhouse steel framework, generator floor, draft tube construction, incline, views from above, penstock construction, Tunnel 3, CO2 equipment on Unit 3, Penstock binding, dispatcher's building, manifold assembly, oil circuit breakers, transformers, Dam 6 spilling, completed Powerhouse 3.
photCL SCE

Visual Materials
Big Creek Powerhouse #8 - Looking down on Powerhouse 8, showing conditions at end of construction road, storage space being provided, et. The road along the left center of the picture, and upon which two men are standing, is the section which will be used for reaching the generator floor of the 2nd unit. The concrete mixing plant, rock and sand bins, are just beginning to take form in the center of the picture by the derrick.
photCL SCE 02 - 15901