Visual Materials
Big Creek, Stevenson Creek Test Dam
- Description
- Big Creek, Stevenson Creek Test Dam - Stevenson Creek Falls, showing completed covered bridge over Stevenson Creek.
- Date
- 5/1/1922
- Call number
- photCL SCE 02 - 07967
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek, Stevenson Creek Test Dam - [Covered] bridge over Stevenson Creek.
photCL SCE 02 - 07970

Visual Materials
Big Creek, Stevenson Creek Test Dam - Drilling anchorage for bridge over Stevenson Creek.
photCL SCE 02 - 07965

Visual Materials
Big Creek, Stevenson Creek Test Dam - [Construction - Overview of downstream side showing road into Big Creek and bridge across Stevenson Creek above dam.
photCL SCE 02 - 14229

Visual Materials
Big Creek, Stevenson Creek Test Dam - [Upstream side of dam during construction. Overview from above showing road into Big Creek and bridge across Stevenson Creek, and several access stairways and inclined rails down to dam.].
photCL SCE 02 - 14228

Visual Materials
Big Creek, Stevenson Creek Test Dam - [Upstream side of dam during construction. Overview from above showing road into Big Creek and bridge across Stevenson Creek, and several access stairways and inclined rails down to dam.].
photCL SCE 02 - 14227

Visual Materials
Big Creek, Stevenson Creek Test Dam - Lower falls on Stevenson Creek.
photCL SCE 02 - 07917