Visual Materials
T2 Testing - Flash
- Description
- T2 Testing - Flash-over on 220kV Eagle Rock T/L.
- Date
- 12/1/1921
- Call number
- photCL SCE 02 - 07411
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
T2 Testing - Flash-over on 220kV Eagle Rock T/L.
photCL SCE 02 - 07410

Visual Materials
T2 Testing - Flash-over on 220kV Eagle Rock T/L (double).
photCL SCE 02 - 07412

Visual Materials
T2 Testing - Arc caused by pulling switch on Eagle Rock 220kV transmission line.
photCL SCE 02 - 07413

Visual Materials
T2 Testing - Arc caused by pulling switch on Eagle Rock 220kV transmission line.
photCL SCE 02 - 07414

Visual Materials
T2 Testing - Arc caused by pulling switch on Eagle Rock 220kV transmission line.
photCL SCE 02 - 07415

Visual Materials
T2 Testing - Arc caused by pulling switch on Eagle Rock 220kV transmission line.
photCL SCE 02 - 07416