Visual Materials
Big Creek Powerhouse #3 - Tunnel 3 - Steel reinforcing screen partially covered with gunite.
photCL SCE 02 - 30515

Visual Materials
Big Creek Powerhouse #3 - Machine Shop floor forms and steel.
photCL SCE 02 - 27422

Visual Materials
Big Creek - Powerhouse #3 (part 1) [first forms up on powerhouse, staging and concrete plant, Switching Station, powerhouse steel framework, generator floor, draft tube construction, incline, views from above, penstock construction, Tunnel 3, CO2 equipment on Unit 3, Penstock binding, dispatcher's building, manifold assembly, oil circuit breakers, transformers, Dam 6 spilling, completed Powerhouse 3.]
photCL SCE 13 - vol 032

Visual Materials
Big Creek Powerhouse #3 - Portion of Project 3 Road construction between tunnel outlet (Camp 37), and the SJ&E RR junction (Camp 39) which was constructed in soil covered slopes.
photCL SCE 02 - 07945

Visual Materials
Big Creek Powerhouse #4 - Construction pictures taken by Dam & Tunnel office. [Installing forms and reinforcing steel for foundation blocks at Dam 7]
photCL SCE 02 - 42278

Visual Materials
Big Creek Powerhouse #4 - Construction pictures taken by Dam & Tunnel office. [Installing forms and reinforcing steel for foundation blocks at Dam 7]
photCL SCE 02 - 42279