Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

Powerhouse 8



You might also be interested in

  • Powerhouse 8

    Powerhouse 8

    Visual Materials

    Powerhouse 8 - First steel framing in place for Transformer Building.

    photCL SCE 02 - 06889

  • Big Creek Powerhouse 8

    Big Creek Powerhouse 8

    Visual Materials

    Big Creek Powerhouse 8 - General view from across river [Powerhouse 8 framed showing upper and lower section. Concrete for the lower part has been poured. The walls for the upper part have not been poured yet.]

    photCL SCE 02 - 07122

  • Powerhouse #8

    Powerhouse #8

    Visual Materials

    Powerhouse #8 - Initial framing for

    photCL SCE 02 - 06823

  • Powerhouse #8 - Framing of Powerhouse 8

    Powerhouse #8 - Framing of Powerhouse 8

    Visual Materials

    Powerhouse #8 - Framing of Powerhouse 8 - east and north sides.

    photCL SCE 02 - 06854

  • Big Creek Powerhouse #8 - Upper section of Powerhouse #8

    Big Creek Powerhouse #8 - Upper section of Powerhouse #8

    Visual Materials

    Big Creek Powerhouse #8 - Upper section of Powerhouse #8 - Draft tube at Cascada Machine Shop.

    photCL SCE 02 - 12208

  • Powerhouse #8

    Powerhouse #8

    Visual Materials

    Powerhouse #8 - Construction framing of Powerhouse #8

    photCL SCE 02 - 06856