Powerhouse 8
- Description
- Powerhouse 8 - General building [framing for upper section]
- Date
- 7/9/1921
- Call number
- photCL SCE 02 - 07121
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Powerhouse 8 - First steel framing in place for Transformer Building.
photCL SCE 02 - 06889

Visual Materials
Big Creek Powerhouse 8 - General view from across river [Powerhouse 8 framed showing upper and lower section. Concrete for the lower part has been poured. The walls for the upper part have not been poured yet.]
photCL SCE 02 - 07122

Visual Materials
Powerhouse #8 - Framing of Powerhouse 8 - east and north sides.
photCL SCE 02 - 06854

Visual Materials
Big Creek Powerhouse #8 - Upper section of Powerhouse #8 - Draft tube at Cascada Machine Shop.
photCL SCE 02 - 12208

Visual Materials
Powerhouse #8 - Construction framing of Powerhouse #8
photCL SCE 02 - 06856