Visual Materials
Powerhouse 8
You might also be interested in

Powerhouse 8
Visual Materials
Powerhouse 8 - First steel framing in place for Transformer Building.
photCL SCE 02 - 06889

Big Creek Powerhouse 8
Visual Materials
Big Creek Powerhouse 8 - General view from across river [Powerhouse 8 framed showing upper and lower section. Concrete for the lower part has been poured. The walls for the upper part have not been poured yet.]
photCL SCE 02 - 07122

Powerhouse #8 - Framing of Powerhouse 8
Visual Materials
Powerhouse #8 - Framing of Powerhouse 8 - east and north sides.
photCL SCE 02 - 06854

Big Creek Powerhouse #8 - Upper section of Powerhouse #8
Visual Materials
Big Creek Powerhouse #8 - Upper section of Powerhouse #8 - Draft tube at Cascada Machine Shop.
photCL SCE 02 - 12208

Powerhouse #8
Visual Materials
Powerhouse #8 - Construction framing of Powerhouse #8
photCL SCE 02 - 06856