Visual Materials
Big Creek, Florence Lake Dam
- Description
- Big Creek, Florence Lake Dam - Portal of Adit to Florence Lake Tunnel with workmen posing at entrance. Camp 61
- Date
- 1921
- Call number
- photCL SCE 02 - 06807
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek, Florence Lake Dam - Tunnel #6, Adit #2 - Portal at Camp #61.
photCL SCE 02 - 09481

Visual Materials
Big Creek, Florence Lake Dam - Ward Tunnel entrance to adit at camp #62.
photCL SCE 02 - 27139

Visual Materials
Big Creek, Florence Lake Dam - Portal of Adit - Camp 61 [covered with snow]
photCL SCE 02 - 06534

Visual Materials
Big Creek, Florence Lake Dam - Tunnel #6, Adit #1 - Portal at Camp #62.
photCL SCE 02 - 09480

Visual Materials
Big Creek, Florence Lake Dam - Ward Tunnel Repairs - Excavating for floor concrete in section at Station 330-21 to 332-23 - approximately 2,300 ft. below Adit at Camp 61.
photCL SCE 02 - 26571

Visual Materials
Big Creek, Florence Lake Dam - Tunnel #6, Adit #2, West - Double timbering, Camp #61
photCL SCE 02 - 08962