Visual Materials
Kern River No. 3
- Description
- Kern River No. 3 - North line (KR#3 penstock) showing position of chamber to manhole.
- Date
- 8/15/1922
- Call number
- photCL SCE 02 - 06365
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Kern River No. 3 - North line KR#3 Penstock showing bottom floor conditions.
photCL SCE 02 - 06368

Visual Materials
Kern River No. 3 - South line KR#3 Penstock reinforcing in wall of anchor
photCL SCE 02 - 06366

Visual Materials
Kern River No. 3 Conduit - #2 Penstock - Lower Manhole. Start of weld, showing supports which were later removed.
photCL SCE 02 - 26843

Visual Materials
Kern River No. 3 - penstock - manhole chambers
photCL SCE 02 - 11037

Visual Materials
Kern River No. 3 - Penstock #1 - view inside of pipe at a manhole half-way up.
photCL SCE 02 - 25669

Visual Materials
Kern River No. 3 Conduit - #2 Penstock - Lower Manhole. Preparing surface in cutout manhole just before welding in manhole cover.
photCL SCE 02 - 26842