Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

Kern River No. 1



You might also be interested in

  • Kern River No. 1 - Intake dam

    Kern River No. 1 - Intake dam

    Visual Materials

    Kern River No. 1 - Intake dam - [and headworks with sandbox in right foreground].

    photCL SCE 02 - 01197

  • Kern River No. 1

    Kern River No. 1

    Visual Materials

    Kern River No. 1 - The sandbox [at the at KR #1 headworks with sluice gates open flushing the sandox.]

    photCL SCE 02 - 01182

  • Image not available

    Kern River No. 1

    Visual Materials

    Kern River No. 1, including site for Democrat Dam; Dam construction and drainage tower; intake; dam spilling; Construction at Camp 4; Kern River Canyon, hospital, tunnel workers, tunnel portal, concrete mixing plant, concrete flume, tunnel automobiles; Camp 1, penstock construction, branch pipes, Powerhouse construction, machinery transport to site, assembly of units in powerhouse, placing "Y" piece, main water valve needle, exciter needle, impulse wheel and buckets, transformers, tailrace construction, original spillway, towers and erect insulators, transmission line; Tejon, Castaic and Fernando Substations, Los Angeles No. 3 Steam Plant.

    photCL SCE

  • Kern River No. 1

    Kern River No. 1

    Visual Materials

    Kern River No. 1 - Kern River #1 headworks [and headworks cottage]

    photCL SCE 02 - 05598

  • Kern River No. 1

    Kern River No. 1

    Visual Materials

    Kern River No. 1 - [Man operating hydro gates for the drainage tunnel.

    photCL SCE 02 - 01262

  • Image not available

    Kern River Project; Kings River

    Visual Materials

    Kings River Powerhouse No. 1 and cottages, headworks, Lucas Creek Flume, Cow Creek flume, Borel Powerhouse with 5 penstocks, Isabella (1907); Kings River No. 1 Water Appropriation Notice, Kings River No. 2 - Camp near Mill Creek, posted notice, material storage, warehouse at Tunnel 9; Kings River No. 3 - South Fork Gorge and Intake site, Crown Valley, Little Brush Creek, construction road, Water Appropriation Notice; Kings River No. 4 - Tehachapi Basin, lumber yards, water appropriation notice at intake site, P.D. Plant and spillway at mouth of Kern Canyon.

    photCL SCE