Visual Materials
Big Creek, Powerhouse #1
- Description
- Big Creek, Powerhouse #1 - Sluicing mud banks out of PH2 forebay
- Date
- 11/26/1920
- Call number
- photCL SCE 02 - 06513
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek PH #2 - Mud banks in bottom of forebay for Powerhouse #2, at Powerhouse #1 tailrace.
photCL SCE 02 - 06512

Visual Materials
Big Creek, Powerhouse #1 - Mud banks in the intake pond at powerhouse #1. [Man with hose scouring river bed near dam.]
photCL SCE 02 - 06511

Visual Materials
Big Creek - Early Big Creek [Substations; Big Creek - PH 1 and PH 2 penstock construction, Huntington Lodge & Lake, heavy snowfall, break in PH1 penstock joint, const. Dam #1 & gate tower, Dam 1 spilling, Dam #2 const., Dam #4 const., PH1 const., PH1 interior, PH2 const., PH2 after fire, PH2 interiors (Units & Transformers), unit install PH1, incline RR, railroad locomotives, Big Creek transmission line const.; Magunden Sub.; Kern T/L poles, line and RR wash out at Arroyo Seco; Long Beach Steam Plant; Los Angeles Aquiduct and Powerhouse; PL&P vehicles; Intake Azusa Plant, Azusa PH interior; Highgrove forebay & Powerhouse; Stone Castle; Sierra Powerhouse interior, operator's cottages; Pedley Powerhouse (ext. & int.), Mentone PH; Borel Powerhouse]
photCL SCE 13 - vol 041

Visual Materials
Big Creek Powerhouse #1 - Tailrace channel sluicing Dam #4.
photCL SCE 02 - 26507A

Visual Materials
Big Creek Powerhouse #1 - Tailrace channel sluicing Dam #4 [variant of 02-26507a].
photCL SCE 02 - 26507B

Visual Materials
Big Creek Powerhouse #1 - Tailrace channel sluicing Dam #4 [variant of 02-26507a].
photCL SCE 02 - 26507C