Opening Hours
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Stageing area in forest for penstock pipe for PH #2.
photCL SCE 02 - 05721

Visual Materials
Powerhouse 2 & 2A - Pressure Main anchor and banded steel penstock pipe.
photCL SCE 02 - 15642

Visual Materials
Powerhouse 2 & 2A - Pressure Main anchor and plain steel penstock pipe.
photCL SCE 02 - 15643

Visual Materials
Powerhouse 2 & 2A - Lower end of Penstock 2A, showing forged seamless pipe.
photCL SCE 02 - 15902
Image not available
Visual Materials
Photographs of Powerhouse 2 and 2A, Part Three. Construction at Powerhouse 2A, images depicting the fabrication of seamless steel pressure pipe [penstock] sections, forging hollow steel blocks into pipe, machining seamless steel pipe sections to proper thickness, pressure testing pipe sections, assembly of penstock sections and valves at Powerhouse 2A.
photCL SCE

Visual Materials
The penstock at the head of the pipe line at Kaweah #2 Hydro Plant, November 10, 1904. An operator is standing at the top.
photCL SCE 04 - 00072