Visual Materials
Kern River No. 3
You might also be interested in

Kern River No. 3
Visual Materials
Kern River No. 3 - Dave Redinger (right) and Kemp standing on track outside entrance to tunnel adit at Camp 7
photCL SCE 02 - 04958

Kern River No. 3
Visual Materials
Kern River No. 3 - Men at the KR3 Sandbox showing baffels and gates
photCL SCE 02 - 06625

Kern River No. 3
Visual Materials
Kern River No. 3 - Construction of the KR3 sandbox at Fairview Dam.
photCL SCE 02 - 06240

Kern River No. 3
Visual Materials
Kern River No. 3 - Switchrack and lightning arrestors on roof of KR3 [with penstocks feeding into powerhouse in the background.]
photCL SCE 02 - 06612

Kern River No. 3
Visual Materials
Kern River No. 3 - Defective Step Bearing from KR3 Turbo.
photCL SCE 02 - 10511

Kern River No. 3
Visual Materials
Kern River No. 3 - Trip of Dennis and Doolittle. [View of Kern River.]
photCL SCE 02 - 02573