Visual Materials
Big Creek, Huntington Lake Dams - Dam #3A Old core drill hole 12 in front of dam.
photCL SCE 02 - 23627

Visual Materials
Big Creek, Huntington Lake Dams - Copy of Page 12 of Stone & Webster Report on Backfills on Dams at Huntington Lake: 42. Drilling 30' grout holes. 43. Grouting 30'grout holes. Blow pipe in hole in foreground. 44. View of grouting connections. One hole being grouted, another under air pressure after final refusal. 45. Old core drill hole 12 in front of Dam 3A, through which water tests were made. Note broken condition of rock typical in vicinity of this dam. 46. View of upstream face of Dam 3A after backfill has been replaced.
photCL SCE 02 - 21855

Visual Materials
Big Creek Huntington Lake Dams - Job H-79 No 89 - looking E. at Dam site #3a.
photCL SCE 02 - 04778

Visual Materials
Big Creek, Huntington Lake Dams - Dam #3A Huntington Lake. View of grouting connections.
photCL SCE 02 - 23628

Visual Materials
Big Creek, Huntington Lake Dams - Dam #3A Huntington Lake. Drilling 30 ft. Grout holes.
photCL SCE 02 - 23629

Visual Materials
Big Creek, Huntington Lake Dams - Copy of Page 8 of Stone & Webster Report on Backfills on Dams at Huntington Lake: 23. Dam 3. Typical chipped out vertical contraction crack before guniting. 24. Dam 3. Chipped out vertical & horizontal cracks near north end. 25. Dam 3A. Excavation at upstream face and water test of old drill hole 12 in progress. 26. Dam 3A. Looking south from station 0+25. Upstream cut off wall during excavation.
photCL SCE 02 - 21851