Visual Materials
Big Creek Huntington Lake Dams
- Description
- Big Creek Huntington Lake Dams - Thew No. 0 shovel excavating for dam 3A
- Date
- 10/2/1917
- Call number
- photCL SCE 02 - 04774
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek, Huntington Lake Dams - Copy of Page 8 of Stone & Webster Report on Backfills on Dams at Huntington Lake: 23. Dam 3. Typical chipped out vertical contraction crack before guniting. 24. Dam 3. Chipped out vertical & horizontal cracks near north end. 25. Dam 3A. Excavation at upstream face and water test of old drill hole 12 in progress. 26. Dam 3A. Looking south from station 0+25. Upstream cut off wall during excavation.
photCL SCE 02 - 21851

Visual Materials
Big Creek, Huntington Lake Dams - Dam #3A Huntington Lake. View of grouting connections.
photCL SCE 02 - 23628

Visual Materials
Big Creek, Huntington Lake Dams - Dam #3A Huntington Lake. Drilling 30 ft. Grout holes.
photCL SCE 02 - 23629

Visual Materials
Big Creek, Huntington Lake Dams - Dam 3a [covered with snow].
photCL SCE 02 - 24568

Visual Materials
Big Creek Huntington Lake Dams - Loading gravel for washing plant with No. 0 Thew shovel. Job H-79#12
photCL SCE 02 - 04715

Visual Materials
Big Creek Huntington Lake Dams - Dam 3A [Men grading with mule teams behind dam]
photCL SCE 02 - 04839