Visual Materials
Visual Materials
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
The concreting crew inside the penstock at Kern River #1 Hydro Plant.
photCL SCE 01 - 00625

Visual Materials
A section of the penstock on the hoist line at Kern River #1 Hydro Plant.
photCL SCE 01 - 00619

Visual Materials
A section of penstock for Kern River #1 Hydro Plant being hauled up the trail in Kern River Canyon by a team of horses.
photCL SCE 01 - 00637

Visual Materials
Kern River #1 Hydro Plant - Method of riveting sections of the penstock inside the tunnel at.
photCL SCE 01 - 00622

Visual Materials
A man standing behind the needle for the prime mover waterwheel at Kern River #1 Hydro Plant.
photCL SCE 01 - 00644

Visual Materials
The six man surveying crew standing at the mouth of the tunnel at Kern River #1 Hydro Plant.
photCL SCE 01 - 00606