Visual Materials
Big Creek PH 2
- Description
- Big Creek PH 2 - Dam 4 [spilling], and Big Creek Powerhouse 1 from below
- Date
- 7/15/1917
- Call number
- photCL SCE 02 - 04046
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek PH #2 - [Powerhouse 2, inclined railroad, and construction camp below.]
photCL SCE 02 - 05408

Visual Materials
Big Creek Powerhouse #3 - PH #3 - Dam 6 [spilling] and Intake tower.
photCL SCE 02 - 22923

Visual Materials
Big Creek - Early Big Creek [Substations; Big Creek - PH 1 and PH 2 penstock construction, Huntington Lodge & Lake, heavy snowfall, break in PH1 penstock joint, const. Dam #1 & gate tower, Dam 1 spilling, Dam #2 const., Dam #4 const., PH1 const., PH1 interior, PH2 const., PH2 after fire, PH2 interiors (Units & Transformers), unit install PH1, incline RR, railroad locomotives, Big Creek transmission line const.; Magunden Sub.; Kern T/L poles, line and RR wash out at Arroyo Seco; Long Beach Steam Plant; Los Angeles Aquiduct and Powerhouse; PL&P vehicles; Intake Azusa Plant, Azusa PH interior; Highgrove forebay & Powerhouse; Stone Castle; Sierra Powerhouse interior, operator's cottages; Pedley Powerhouse (ext. & int.), Mentone PH; Borel Powerhouse]
photCL SCE 13 - vol 041

Visual Materials
Big Creek PH #2 - Dam 4 and Cascada at Big Creek
photCL SCE 02 - 07401

Visual Materials
Big Creek PH #2 - Balsam Creek weir in the snow looking upstream at spilling wier.
photCL SCE 02 - 06536