![Kern River Miscellaneous - Kern River #4 [never built]](/_next/image?url=https%3A%2F%2Frail.huntington.org%2FIIIF3%2FImage%2F22APN4PSIC8V%2Ffull%2F%5E360%2C%2F0%2Fdefault.jpg&w=750&q=75)
Visual Materials
Kern River Miscellaneous - Kern River #4 [never built] - Lower Dam site, from below.
photCL SCE 02 - 03022

Visual Materials
Kern River Miscellaneous - Rio Bravo looking upstream from the upper dam site showing ponding space that will be made when dam is built. #2
photCL SCE 02 - 00833
![Kern River Miscellaneous - Kern River #4 [never built]](/_next/image?url=https%3A%2F%2Frail.huntington.org%2FIIIF3%2FImage%2F22APN44FRLBJ%2Ffull%2F%5E360%2C%2F0%2Fdefault.jpg&w=750&q=75)
Visual Materials
Kern River Miscellaneous - Kern River #4 [never built] - Camp at Little Kern
photCL SCE 02 - 03024

Visual Materials
Kern River No. 1 - The gates at the Kern River #1 dam [Democrat Dam]
photCL SCE 02 - 00820

Visual Materials
Kern River No. 1 - Downstream face of Kern River #1 diversion dam [Democrat Dam].
photCL SCE 02 - 26377
Image not available
Visual Materials
Kern River No. 1, including site for Democrat Dam; Dam construction and drainage tower; intake; dam spilling; Construction at Camp 4; Kern River Canyon, hospital, tunnel workers, tunnel portal, concrete mixing plant, concrete flume, tunnel automobiles; Camp 1, penstock construction, branch pipes, Powerhouse construction, machinery transport to site, assembly of units in powerhouse, placing "Y" piece, main water valve needle, exciter needle, impulse wheel and buckets, transformers, tailrace construction, original spillway, towers and erect insulators, transmission line; Tejon, Castaic and Fernando Substations, Los Angeles No. 3 Steam Plant.
photCL SCE