Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

Kern River No. 1



You might also be interested in

  • Kern River No. 1

    Kern River No. 1

    Visual Materials

    Kern River No. 1 - The operator's cottage at Kern River #1.

    photCL SCE 02 - 01025

  • The staff standing on the porch and steps of the hospital at the Kern River Headquaters Camp at Kern River #1 Hydro Plant

    The staff standing on the porch and steps of the hospital at the Kern River Headquaters Camp at Kern River #1 Hydro Plant

    Visual Materials

    The staff standing on the porch and steps of the hospital at the Kern River Headquaters Camp at Kern River #1 Hydro Plant.

    photCL SCE 01 - 00604

  • Kern River No. 1

    Kern River No. 1

    Visual Materials

    Kern River No. 1 - Operator [standing on top of rock]

    photCL SCE 02 - 01240

  • Kern River No. 1

    Kern River No. 1

    Visual Materials

    Kern River No. 1 - Reinforcement bands for Kern River #1 Hydro Plant. [A man is standing in the bands that were being delivered by rail to Edison.]

    photCL SCE 02 - 00281

  • Kern River No. 3

    Kern River No. 3

    Visual Materials

    Kern River No. 3 - Chief Operator's Cottage [plus additional shot of same cottage (#06336) on same photocard]

    photCL SCE 02 - 06335

  • Kern River & Borel Transmission Line

    Kern River & Borel Transmission Line

    Visual Materials

    Kern River & Borel Transmission Line - A man standing in the special Kern River 60 KV tower at the San Fernando Substation, showing an Operator's Cottage next to Substation. [spindly looking tower built by a local windmill manufacturer carries power from Kern River into Los Angeles. Built in 1906, the record setting 117-mile long, 75kV transmission line was the first in nation to be carried entirely on steel support towers. (wam)]

    photCL SCE 02 - 00256