Big Creek Powerhouse #2
- Description
- Big Creek Powerhouse #2 - Excavation for Penstock.
- Date
- 9/22/1913
- Call number
- photCL SCE 03 - 00373
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek Powerhouse #2 - Beginning pressure pipe at lower end of tunnel #2 - Taken during construction showing excavation for pressure pipe.
photCL SCE 03 - 00363

Visual Materials
Big Creek Powerhouse #3 - PH #3 - Excavation for anchor #2, 4th unit penstock.
photCL SCE 02 - 27512

Visual Materials
Construction Big Creek Powerhouse 1 and 2 [Construction Big Creek Powerhouse 1, & 2; Locomotive #11 in snow; snow survey; Construction Camps 1F, 2, 6, & 7; excavation Tunnels 1, & 2; construction at Dams 1, 2, 3, & 4; penstock & flow-line construction; sawmill; gravel pit; incline railways; Cascada material staging.]
photCL SCE 13 - vol 002

Visual Materials
Big Creek Powerhouse #2 - Excavation for the Unit in PH #2-A nearest Powerhouse #2.
photCL SCE 02 - 14321

Visual Materials
Big Creek Powerhouse #4 - View from across river of excavation for Powerhouse #4, and Penstock.
photCL SCE 02 - 29625

Visual Materials
Big Creek - Powerhouse #8 (part 2) [Powerhouse #8 - Diversion, excavation for powerhouse, diversion tunnel construction, interior shots of PH #8 (transformers, control room, turbine-generator assembly, station power, Johnson Valve, turbine runner, crane assembly, scroll case assembly, draft tube); Penstock rupture - ripped Penstock, flattened pipe, damage to powerhouse and other facilities, reshaping pipe, adding reinforcing bands to high stress sections of penstock; Camp 33, operator dormitory, substation, incline construction.]