Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

Huntington residence under construction



You might also be interested in

  • Image not available

    Huntington residence under construction

    Visual Materials

    Photograph of the scaffolding and forms for a portion of the basement walls and foundation. In the background, workmen can be seen pouring concrete into one of the forms. Other workmen walk along the scaffolding. Typed across the top of the photograph: H. E. Huntington house, Dec. 8th, 1908.

    photCL 285

  • Image not available

    Huntington residence under construction

    Visual Materials

    Photograph of the scaffolding and forms for a portion of the basement walls and foundation. Workmen can be seen pouring concrete into one of the forms and working it with long poles. Typed across the top of the photograph: H. E. Huntington house, Dec. 8th, 1908.

    photCL 285

  • Image not available

    Huntington residence under construction

    Visual Materials

    Photograph of a portion of the basement walls, concrete poured and forms removed. Scaffolding and forms remain on the side opposite of the completed walls.

    photCL 285

  • Image not available

    Huntington residence under construction

    Visual Materials

    Photograph of the scaffolding and forms for a portion of the upper walls. Typed along the top of the photograph: Dec. 11th 1908 H. E. Huntington house.

    photCL 285

  • Image not available

    Huntington residence under construction

    Visual Materials

    Photograph of workmen pouring the concrete for the foundation and the basement walls. Entire space filled with forms and scaffolding.

    photCL 285

  • Image not available

    Huntington residence under construction

    Visual Materials

    View of the house work site showing the scaffolding and forms for the upper walls. Typed along the top of the photograph: Dec. 11th 1908 H. E. Huntington house.

    photCL 285