Visual Materials
Huntington residence under construction
You might also be interested in

Dining room in the Huntington residence during construction, circa 1910
Visual Materials
A view of the dining room during construction. The marble fireplace and fine crown molding have already been installed, but the hardwood floor has not. MS note on verso reads "HEH residence interior."
photCL 107 fld22 (2)

Southeast end of the library of the Huntington residence under construction
Visual Materials
The south wall in the west end of the library. The fireplace and crown molding have been installed, but the room is still a work in progress. MS note on verso reads "HEH residence interior."
photCL 107 fld22 (6)
Image not available
West end of the library of the Huntington residence while under construction, circa 1910
Visual Materials
The bookcases and doors to the next room are already in place, and the hardwood floor is in the process of being installed. MS note on verso reads "HEH residence interior."
photCL 107 fld22 (8)

West end of the library of the Huntington residence while under construction, circa 1910
Visual Materials
The bookcases and doors to the next room are already in place, and the hardwood floor is in the process of being installed. MS note on verso reads "HEH residence interior."
photCL 107 fld22 (8)

First floor hallway of the Huntington residence during construction, circa 1910
Visual Materials
A view facing the north entrance, with the library on the right and the large drawing room on the left. Decorative columns and light fixtures have been installed, but workman's bench and scattered tools show that construction is still in progress. MS note on verso reads "HEH residence interior."
photCL 107 fld22 (1)

Large drawing room in the Huntington residence during construction
Visual Materials
View of double door with an arched frame decorated with garlands and cherubs. MS note on verso reads "HEH residence interior."
photCL 107 fld22 (7)