Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Manuscripts

"Sinaloa River Bridge." File No. 331.1-973-(S), Part 1. Clearly there was a LONG gestation period for this bridge and above bridge. Same note on related files on cover. Perhaps ten letters and telegrams. Construction cost in was estimated at $361,360 U.S. Includes coded parts of a telegram (the underlined parts only are coded; this makes it very easy to pick out what the SP considered confidential) "...Use price for steel f.o.b. Gary three point four nine cents per pound... Consider price confidential." Etc. Detailed technical material on the bridge's construction


You might also be interested in