Opening Hours
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Image not available
Manuscripts
(Film by Jack Brady Productions) Footage of Solar One site, including solar panels, control room, employees. Southern California Edison's Solar One project began operation in 1982 and was the nation's first large-scale solar energy generation site. It was located in the Mojave Desert, in San Bernardino County, Ca. Format of original: Reel
SCE MP 080
Image not available
Manuscripts
Engineers viewing detailed model of solar energy panels. Format of original: Reel
SCE MP 127
Image not available
Manuscripts
Southern California Edison's Solar One project began operation in 1982 and was the nation's first large-scale solar energy generation site. It was located in the Mojave Desert, in San Bernardino County, Ca. Format of original: Soundtrack?
SCE MP 107
Image not available
Manuscripts
Southern California Edison's Solar One project began operation in 1982 and was the nation's first large-scale solar energy generation site. It was located in the Mojave Desert, in San Bernardino County, Ca. Format of original: Reel
SCE MP 287
Image not available
Manuscripts
[Same footage as SCE MP 010] Format of original: Reel
SCE MP 011
Image not available
Manuscripts
Format of original: Reel
SCE MP 279