Opening Hours
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Image not available
Manuscripts
Interiors and exteriors of nuclear plant, including employees in classroom, control room, telephones, offices, monitors and computers, operations scenes. Format of original: Reel
SCE MP 125
Image not available
Manuscripts
(Film by Jack Brady Productions) Footage of Solar One site, including solar panels, control room, employees. Southern California Edison's Solar One project began operation in 1982 and was the nation's first large-scale solar energy generation site. It was located in the Mojave Desert, in San Bernardino County, Ca. Format of original: Reel
SCE MP 080
Image not available
Manuscripts
Format of original: U-Matic (See DVD copy) Run time: 14:30 SCE media stock footage of the Balsam Meadow Hydroelectric Project showing construction in progress.
SCE MP 292
Image not available
Manuscripts
[i.e. San Onofre Nuclear Generating Station (SONGS).] Format of original: Reel
SCE MP 093
Image not available
Manuscripts
Hydroelectric power, water rushing, men inspecting equipment. Film by Jack Brady Productions. Format of original: Reel
SCE MP 136
Image not available
Manuscripts
Format of original: Reel Documenting conditions at Big Creek, including waterfall near PH 8, Dam 6, Mammoth pool and spillway and the San Joaquin River.
SCE MP 470