Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Manuscripts

The Tyler Prize


You might also be interested in

  • Image not available

    Wind Turbine Start-Up

    Manuscripts

    Format of original: Reel. Documenting the early development of wind power in California and capturing activation of the first wind turbine in Riverside County.

    SCE MP 503

  • Image not available

    Wind Turbine Dedication and Plant Tour, Riverside County, 1979-1980

    Manuscripts

    Format of original: Reel. Reel 1: Tour and dedication of wind turbine with Riverside County supervisors, Dec. 16, 1980. Reel 2: Dated May 15, 1979, appears to be a tour of "Trade West Engineering Inc." -- presumably parts of the turbine were engineered at this facility. Color is faded. Creator: Brady, Jack

    SCE MP 498

  • Image not available

    Tyler Prize

    Manuscripts

    Format of original: Reel

    SCE MP 496

  • Image not available

    Tyler Prize, 1982

    Manuscripts

    Format of original: Reel

    SCE MP 079

  • Image not available

    The Tyler Prize

    Manuscripts

    Format of original: Sound- track?

    SCE MP 459

  • Image not available

    Alternate and Renewable Energy Programs Stock Footage Nov. 1983

    Manuscripts

    Format of original: U-Matic (See DVD copy) Run time: 15:30 SCE media stock footage showing the Bendix 1300 Wind Turbine Generator, Tehachapi Mountain wind resources area, the Arco photovoltaic project in Hesperia, the SCE photovoltaic project at Palm Springs city hall, and the Salton Sea geothermic project.

    SCE MP 294