Opening Hours
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Image not available
Manuscripts
Format of original: Reel. Documenting the early development of wind power in California and capturing activation of the first wind turbine in Riverside County.
SCE MP 503
Image not available
Manuscripts
Format of original: Reel. Reel 1: Tour and dedication of wind turbine with Riverside County supervisors, Dec. 16, 1980. Reel 2: Dated May 15, 1979, appears to be a tour of "Trade West Engineering Inc." -- presumably parts of the turbine were engineered at this facility. Color is faded. Creator: Brady, Jack
SCE MP 498
Image not available
Manuscripts
Format of original: U-Matic (See DVD copy) Run time: 15:30 SCE media stock footage showing the Bendix 1300 Wind Turbine Generator, Tehachapi Mountain wind resources area, the Arco photovoltaic project in Hesperia, the SCE photovoltaic project at Palm Springs city hall, and the Salton Sea geothermic project.
SCE MP 294