Manuscripts
202 W. First - Fluor Corp. & Western Air & Refrigeration, job outlines, cooling tower
You might also be interested in
Image not available
202 W. First - Worthington Pump & Machinery Corp. proposal to Western Air & Refrigeration Inc. (water cooling systems)
Manuscripts
20+ pp. of material including proposal, specifications and charts related to water cooling systems for 202 W. First.
mssLAT
Image not available
202 W. First - Times Building, air conditioning, history... outline
Manuscripts
Approx. 25 items: letters, formal work proposals, specifications and related material for air conditioning work to be done at the Times Building, 202 W. First.
mssLAT
Image not available
202 W. First - correspondence with equipment manufacturers on refrigeration machines, etc
Manuscripts
Approx. 20 items: letters, technical drawings, cost "quotations," and related material from a contractor and various subcontractors. Notable items: 48-pp. booklet from Trumbull Electric on "Busways - the overhead that pays for itself in cost reduction" (1947).
mssLAT
Image not available
202 W. First - Specifications for... additions & alterations... n.e. corner of second floor of Times-Mirror Building / Specifications & Details, Times Building, second floor west, new Editorial Department. (Specific dates for both items)
Manuscripts
2 items: approx. 35-pp. specs. for "n.e. corner of second floor," 202 W. First (1962) ; approx. 100-pp. specs. for "second floor west - new Editorial Department," 202 W. First (1962 - Addendum No. 1, 1963).
mssLAT
Image not available
Western States Building-Loan Association
Manuscripts
Approx. 35 items: letters, financial reports, memos, bulletins, and other material related to communications between Western States Building-Loan Association and TM.
mssLAT
Image not available
Job applicants and resumes - Letters Editor
Manuscripts
Approx. 35 items: letters, resumes and selections of the writings of job applicants who contacted Anthony Day in 1986. Resumes removed.
mssLAT