Manuscripts
Approx. 20 items: letters, reports, forms and legal documents related to marble work to be done at new Times building in 1933 and 1934.
mssLAT
Image not available
Manuscripts
Approx. 12 items: letters, memos, forms, reports related to construction of new Times building in 1933 - 1934. Includes 4-pp. report on Job #436 from P.J. Walker Co. to Gordon B. Kaufmann (architect), 12/6/1933.
mssLAT
Image not available
Manuscripts
Approx. 25 items: letters, memos, forms, reports related to construction of new Times building in 1933 - 1934. Includes 4-pp. report on Job #436 from P.J. Walker Co. to Gordon B. Kaufmann (architect), 12/6/1933.
mssLAT
Image not available
Manuscripts
Approx. 100 items: letters, memos, forms and other materials related to electrical wiring work on new Times building, 1933 to 1936. Much of the correspondence is with Newbery Electric Corp., Cline Electric Manufacturing Co. and P.J. Walker Co.
mssLAT
Image not available
Manuscripts
Approx. 10 items: letters, legal documents and forms related to tile work to be done at new Times building in 1933 and 1934.
mssLAT
Image not available
Manuscripts
Approx. 10 items: memos, legal documents and forms related to installation of terrazzo flooring at new Times building in 1933 and 1934.