Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Manuscripts

Floors - cement finish


You might also be interested in

  • Image not available

    Cement

    Manuscripts

    Approx. 25 items: letters and memos on dealings between Times-Mirror, P.J. Walker Co. and California Portland Cement Co. related to construction work on L.A. Times building.

    mssLAT

  • Image not available

    Exterior Finish

    Manuscripts

    2 items: letter, 10/4/1933, P.J. Walker Co. to P. Grassi & Co. (Travertite Works, Inc.) relating to exterior finish work on new Times building, 1933 ; 4-pp. letter, 10/23/1933, from P.J. Walker Co. to Gordon B. Kaufmann relating to exterior finish work new Times building.

    mssLAT

  • Image not available

    Flooring - cork tile

    Manuscripts

    5 items: letters, memos, legal documents and reports related to flooring to be installed at the new Times building, 1933.

    mssLAT

  • Image not available

    Incinerator

    Manuscripts

    5 items: in-house memos of P.J. Walker Co. related to installation of an incinerator at new Times building in 1933.

    mssLAT

  • Image not available

    Fire escapes

    Manuscripts

    2 items: 2-pp. letter, 12/7/1933, P.J. Walker Co. (Raymond Kinne) to Gordon Kaufmann, architect, on "Times Building - Job #436" ; letter, 12/18/1933, P.J. Walker Co. (Raymond Kinne) to Mr. A.D. Stuart, Job Office (Walker Co.) on "Times Building - Job #436."

    mssLAT

  • Image not available

    Newspaper handling equipment

    Manuscripts

    Approx. 25 items: letters, memos, forms, reports related to construction of new Times building in 1933 - 1934. Includes 4-pp. report on Job #436 from P.J. Walker Co. to Gordon B. Kaufmann (architect), 12/6/1933.

    mssLAT